We are seeking your comments on an environmental permit application received from Rainton Construction Limited for:

 

Project Wind, Blyth (Phase B&C)
East Sleekburn
Bedlington
NE22 7FG

 

We can take account of:


•    Relevant environmental regulatory requirements and technical standards.
•    Information on local population and sensitive sites.
•    Comments on whether the right process is being used for the activity, for example whether the technology is the right one.
•    The shape and use of the land around the site in terms of its potential impact, whether that impact is acceptable and what pollution control or abatement may be required.
•    The impact of noise and odour from traffic on site.
•    Permit conditions by providing information that we have not been made aware of in the application, or by correcting incorrect information in the application (e.g. monitoring and techniques to control pollution).


We cannot take account of:


•    Issues beyond those in the relevant environmental regulations.
•    Anything outside the remit of the EPR, e.g. the proposed location of the site, which is done by the local authority via land use planning.
•    Whether a site should have a formal designation under Habitats Directive or other conservation legislation.
•    Whether the activity should be allowed or not as a matter of principle. For example we will not consider whether wood, gas, or coal should be burnt to produce electricity; only that the options and environmental impact of say wood has been considered. We will not consider whether a waste incinerator proposal should be turned into a sorting and recycle proposal, only that the incinerator options and effect have been considered.
•    Land use issues when determining a permit application, even if changing the location of the activity would improve its environmental performance.
•    The impact of noise and odour from traffic travelling to and from the site.
•    The legally defined process we follow to determine a permit.
•    The granting of a permit/variation if the operator is able to demonstrate that they can carry out the activity without significant risk to the environment or human health.

Share Your Views

Share your views by completing our survey. Your feedback is important and will help inform our decisions.

Tell us what you think
Supporting Documents
About this consultation (PDF)
Site Plan GBR1-ENA2-CDL-STE-XX-RP-B-0013 - ESSD - including Non-Technical Summary (PDF)
Dust and Emissions Managment Plan Project Wind (Phase BC) - DEMP (Rev A) (PDF)
Environment Management Plan 4.22 Enabling Works Environmental Management and Monitoring Plan (PDF)
Environment Management Plan GBR1-ENA2-ARC-STE-XX-RP-X-0001 (PDF)
Forms 2. B2 - Application-for-an-environmental-permit-part-b2-general-new-bespoke-permitRedacted (PDF)
Forms 3. B4 - Application-for-a-permit-Part-B4-new-bespoke-waste-operation-permit (PDF)
Forms Application Form Part F1 (PDF)
Forms Part A Redacted (PDF)
Forms Supporting Information Table 1b - Input into for B4 (Word)
Site Plan 70158 BRS Location (PDF)
Site Plan GBR1-ENA2-CDL-STE-XX-DR-C-1103 - Existing Levels (PDF)
Site Plan GBR1-ENA2-CDL-STE-XX-DR-C-1104 - Existing Site Drainage (PDF)
Site Plan GBR1-ENA2-CDL-STE-XX-DR-C-1220 - Surface Finishes (PDF)
Site Plan GBR1-ENA2-CDL-STE-XX-DR-C-1301 - Proposed Enab Fin Lev (PDF)
Site Plan GBR1-ENA2-CDL-STE-XX-RP-B-0013 - ESSD (1) (PDF)
Supporting Information 70158 - Aspects Register - REV 1 Oct 26 (ammended to include BRS) (ZIP)
Supporting Information 70158-PFR-001 Review of Conservation Screening Report Features for BRS Deposition Works (PDF)
Supporting Information 30226657-AUK-XX-XX-RP-ZZ-0017-01-GIR (PDF)
Supporting Information Cambois Campus - Red Shale Chemical Data (PDF)
Supporting Information GBR1-DCZZ-CDL-STE-XX-RP-C-0003 Proposed Drainage Strategy Phase 1 (PDF)
Supporting Information GBR1-DCZZ-MGL-STE-XX-IT-Z-11002 - ITP (ZIP)
Supporting Information GBR1-DCZZ-XXX-UG-RP-B-00-11 - Remediation and Earthworks Strategy (PDF)
Supporting Information GBR1-ENA1-XXX-UG-SP-B-00-01 - Earthworks Specification (PDF)
Supporting Information GBR1-ENA2-ARC-STE-XX-MS-X-0001 (PDF)
Supporting Information GBR1-ENA2-ARC-STE-XX-SH-L-0003 - Landscape Planting (PDF)
Supporting Information GBR1-ENA2-ARC-STE-XX-SP-L-0002- Landscape Spec (PDF)
Supporting Information GBR1-ENA2-CDL-STE-XX-DR-B-1004 - Burnt Shale (PDF)
Supporting Information GBR1-ENA2-CDL-STE-XX-DR-B-1008 - Works Proposals (PDF)
Supporting Information GBR1-ENA2-CDL-STE-XX-RP-B-0012 - WRP (PDF)
Supporting Information GBR1-ENA2-CDL-STE-XX-RP-B-1005 - ES (PDF)
Supporting Information GBR1-ENA2-CDL-STE-XX-SP-B-0001 - Ewks Spec (PDF)
Supporting Information GBR1-RMAPB-CDL-STE-XX-DR-C-1011 - Phase B Drainage Layout (PDF)
Supporting Information Intended Placement Zones and Build Ups - 16102026 (PDF)
Supporting Information Magic Map screen grabs (Phase BC) (Word)
Supporting Information MGL Demolition ISO 14001 2015 Exp 30.04.2029 (PDF)
Supporting Information NCL1-DCZZ-STE-UG-RP-C-00-06 Maw Burn and Cow Gut Dye Tests (PDF)
Supporting Information NCL1-ENA1-STE-UG-RP-C-00-02 - Addendum to DS – Enabling Works Phases + App. (PDF)
Supporting Information PH - 30135 QTS Project Wind CEMP 09.09.2025 Rev 0 (PDF)
Supporting Information Project Wind - Enabling Works Phase B & C - Construction Phase Plan (2) (2) (Word)
Supporting Information Project Wind (Phase BC) - Engineering Construction Proposal (Rev A) (PDF)
Supporting Information QTS Blyth BRS Site Features Review Plan Rev 0 (Phase BC) (Word)
Supporting Information QTS Blyth Technical Summary 1 - (Temporary Stockpile of Invasive Species) (Word)
Supporting Information QTS Blyth Technical Summary 2 - (Earthworks Formations) Rev 2 27.10.2025 (Word)
Supporting Information QTS Blyth Technical Summary 3 Rev 2 - (Approach to Buried Obstructions) (Word)
Supporting Information QTS Blyth Technical Summary 4 Rev 3 - (Compaction Trials) (Word)
Supporting Information QTS Blyth Technical Summary 5 - (Storage and classification of contaminated materials) (Word)
Supporting Information QTS Blyth Technical Summary 6 - (Re-use of PFA) (Word)
Supporting Information QTS Blyth Technical Summary 7 Rev 1 04.11.2025 - (Asbestos onsite) (Word)
Supporting Information QTS Project Wind CEMP Rev 0 (BC (Word)
Supporting Information RCL ISO 14001 2015 Certificate Exp 30.04.2029 (PDF)
Supporting Information Stream 2 Compaction Trial Report 031125 (PDF)
Supporting Information Surface Water Management Plan GBR1 (Word)